A shower flood test is performed by filling the shower base to the curb height and leaving it for 24 hours. This allows time to confirm that the waterproofing system is fully sealed.
If the water level remains unchanged, the system is secure. If it drops, the leak is identified and repaired before tiling begins to ensure proper long-term performance.



